Project Gallery


Preparing to break concrete and remove landscaping


Back patio broken-up and ready for off-haul


Front driveway and sidewalk broken-up


Front driveway and sidewalk before


Beginning pool dig


Bulk of excavation done


Mini excavator dropped-in to dig smaller inner belly


Finish grade for the pool


Using laser level to pitch 120ft. of drainage


Installing the Hydroblox. (www.drainage-technology.com)


Gas line for outdoor barbeque and firepit installed


Off-hauling 90+ yards of soil